GD Star Rating
loading...
loading...

People check out plans for the Houghton Road Multi-Use Corridor. (Photo Adrian Nieoczym)
Displays of the Houghton Road multi-use corridor design plans are currently being shown at an open house until 7 p.m. at the Rutland Centennial Hall, 180 Rutland Road North.
The proposed multi-use corridor will parallel Highway 33 and act as an alternative route for pedestrians and cyclists in Rutland.
City staff and consultants, Site 360 and MMM Group, are on hand to answer questions.
Construction of the $2.8 million multi-use corridor is expected to begin in 2010.


